Design
Detailed digital models turn project requirements into accurate manufacturing information.
Detailed digital models turn project requirements into accurate manufacturing information.
Our in-house engineering team coordinates design, structural and performance requirements for efficient manufacture and installation.
Precision components are produced in our controlled factory environment using advanced manufacturing technology.
Components are manufactured, sequenced and delivered to site in line with the construction programme.
Our experienced installation teams assemble the timber frame efficiently and safely, helping keep projects moving.
Successful offsite construction starts long before production begins.
Our in-house design and engineering teams work closely with clients and project teams to develop timber frame solutions around buildability, performance, manufacturing and installation.
By considering how components will be manufactured, transported and assembled from the outset, we can help simplify construction and make the most of the benefits of offsite manufacturing.
01
Project information developed for accurate manufacture.
02
Design decisions informed by manufacturing and assembly requirements.
03
Design and production teams working as one integrated process.
04
Components and sub-assemblies developed for efficient factory production.
Cygnum's timber frame systems combine advanced offsite manufacture with carefully considered building performance. Components and sub-assemblies can be manufactured with key elements incorporated before reaching site, reducing the amount of work required during construction.
The result is a highly engineered structural solution designed around efficiency, consistency and performance.
Moving construction into a controlled manufacturing environment gives Cygnum greater oversight of how components are produced and assembled.
Quality can be considered throughout the manufacturing process rather than relying solely on inspection at the end. Combined with digital design and experienced installation teams, this creates a more predictable route from specification to completed structure.